SMART GLASS Custom Frames
PRIVACY ON DEMAND
Custom-designed metal frames with switchable privacy smart glass integrated.
Application: private office, home office, conference room, office door, wall divider;
Electrical: plug-in ready or hardwired at your choice;
Control: switch, remote, or app-controlled;
Features: flexible design, privacy on-demand, energy conservation, space optimization, productivity improvement.
Includes:
Divided light partition – custom metal frames designed and installed by Alli Fabrication.
PriWatt Glass – switchable privacy glass provided & installed by Smart Glass Technologies.
Types of Smart Glass frame systems:

Dual Pivot Doors with Dual Side Lights
Frame
One (1) divided light partition (134″ L x 108″ H x 2″ D). 1″x2″ steel frame, 1/2″ sq. trim to secure glass panes. Blackened steel finish on all.
Door / Hardware
Two (2) pivot hinged door, 45″ W, Fritsjurgens system M+ pivot hardware, integrated handle, blackened steel finish, full assembly.

Dual Pivot Doors
Frame
One (1) divided light partition (90″ L x 108″ H x 2″ D). 1″x2″ steel frame, 1/2″ sq. trim to secure glass panes. Blackened steel finish on all.
Door / Hardware
Two (2) pivot hinged door, 45″ W, Fritsjurgens system M+ pivot hardware, integrated handle, blackened steel finish, full assembly.

Single Pivot Door with Single Side Light
Frame
One (1) divided light partition (67″ L x 108″ H x 2″ D). 1″x2″ steel frame, 1/2″ sq. trim to secure glass panes. Blackened steel finish on all.
Door / Hardware
One (1) pivot hinged door, 45″ W, Fritsjurgens system M+ pivot hardware, integrated handle, blackened steel finish, full assembly.

Single Pivot Door
Frame
One (1) divided light partition (45″ L x 108″ H x 2″ D). 1″x2″ steel frame, 1/2″ sq. trim to secure glass panes. Blackened steel finish on all.
Door / Hardware
One (1) pivot hinged door, 45″ W, Fritsjurgens system M+ pivot hardware, integrated handle, blackened steel finish, full assembly.
How to place an order?
1. GET IN TOUCH
Send us the measurements and total square footage and speak with a technician to get a better understanding of the Smart Glass - Divided light partition.
2. APPROVE THE QUOTE
We will send the Estimate and contact you to answer all the technical questions.
3. MANUFACTURE
The average production time for Smart Glass is 30 business days, depending on the size and scope of your project.
4. DELIVERY & INSTALLATION
Delivery of Smart Glass is 1-2 weeks. Your project manager will contact you to schedule the installation.